Skip Navigation LinksHome > Awards > 2013 Design-Build Project Awards > Armstrong HPW Complex
  • LinkedIn
  • Google
  • Delicious
  • Digg
  • Add to Favorites


Armstrong HPW Complex

Civic Buildings, Merit Award

Wright Patterson Air Force Base, Ohio

Owners:
Air Base Wing/Civil Engineer
U.S. Army Corps of Engineers
Design-Builder:
Archer Western/Butt Construction JV
Architect:
Cannon Design
Engineers:
Burgess & Niple
H.C. Nutting Company
Central Fire Protection
Kirk Williams
THP Limited
ESI Electrical Contractors
Specialty Contractor:
High Concrete
Description:
In the largest construction project at Wright-Patterson Air Force Base since World War II, the award-winning 680,000-square-foot Maj. Gen. Harry G. Armstrong Complex was successfully achieved through a collaborative design-build contract to provide the Air Force Research Laboratory’s 711th Human Performance Wing with a state-of-the-art research, training and education and administrative facility. The design-build delivery method achieved the “benefit of best value” for the project, exceeding end-user requirements and delivering the project 89 days early.