Challenge Design-Build Project Delivery Addressed:
Faced with a compressed timeline and a project without a known budget, the owner selected design build to re-build what was lost in the Royal Gorge Fire.
 
Summary:
The Royal Gorge Bridge and Park, a vital economic engine for southern Colorado, was devastated by the Royal Gorge Fire on June 11, 2013. Faced with a compressed timeline and a project without a known budget, the owner selected The Beck Group to re-build the park’s facilities through a fully integrated design- build delivery model. In less than 13 months from award, the Beck team took the project from a scorched site to grand opening.

 

Design-Build Team
Client/Owner The Royal Gorge Bridge and Park
Design-Builder The Beck Group
General Contractor The Beck Group
Architect Beck Architecture, LLC
Engineers Brockette Davis Drake,RMH Group, Inc., Kimley-Horn & Associates
Specialty Contractors KL&A, Inc., Murphy Company, Langston Concrete, Chaparrel (dba Alpine Glass of Grand Junction)
Duration of Construction: 7 months
Project Cost: $13,657,441