Welcome, you are not logged in.
Login
Design-Build DATELINE
The Journal of the Design-Build Institute of America

October 2008

Projects to Watch


New Contracts

Clark goes to College

SAN DIEGO — Clark Design/Build of California Inc. received a $79 million design-build contract for the University of California San Diego North Campus Housing Phase 2 project. The 279,000-squae-foot project includes a 12-story residential tower and low-rise sustainable apartment buildings; it will provide accommodations for 800 students. The buildings will have a cast-in-place concrete exterior with stucco, metal panel and curtainwall façade and will be designed to meet LEED® Silver certification. Construction is scheduled to begin in 2009, with completion in March 2011.

Completed Projects

McCarthy Keeps St. Joseph Healthy

ORANGE, Calif. — McCarthy Building Companies Inc. recently completed three new design-build projects at the St. Joseph Hospital campus here. They included a new 87,000-square-foot cancer center, a 131,000-square-foot medical office building and a 1,083-car parking structure.

The facilities, built on a tight site adjacent to the Garden Grove Freeway, are within walking distance of the main hospital and serve to consolidate cancer patient services in one location.

St. Joseph Health Care Systems representatives have praised McCarthy’s experience and effectiveness for helping contain project costs.

 
1100 H Street, NW, Suite 500 Washington, DC 20005-5476
Phone 202-682-0110 - Toll Free 866-692-0110 - Fax 202-682-5877