Welcome, you are not logged in.
Login
Design-Build DATELINE
The Journal of the Design-Build Institute of America

March 2010

March 2010 Cover
DATELINE

Volume 17, Number 3
March 2010

The Design-Build for Water/Wastewater and Design-Build in Transportation Issue

Below is a listing of the stories in this month's DATELINE, organized by categories. The full text is available to DBIA members through the mail.

Featured Stories

Staying on Track 
By Nick Gustav
Part of New Mexico Governor Bill Richardson’s Investment Partnership, a $1.6 billion initiative that targeted 42 expansion and critical projects to improve transportation infrastructure across the state, the Rail Runner Express project was ambitious in every respect.

Clean Water is the Mission 
By Todd Rich
A serious increase in demand with a shortage in supply, combined with a need for speedy delivery, led the Pala Band of Mission Indians to choose design-build for their new wastewater treatment facility.

Virtual Construction 
By Matt Stevens
The excitement about virtual construction is justified, since the majority of the cost of any building is the actual construction. It is many times more than cost of the design.

DBIA News

Leadership Reflections 

By Lisa Washington, CAE
Executive Director


Since DBIA’s inception in 1993, our organization has celebrated many milestones.

Leadership Reflections 
By Craig Unger, DBIA
While the design-build industry has faced some monumental challenges over the last 10 years, it is nonetheless true that our nation, when confronted with projects that absolutely must be designed, engineered and built in a timely manner, while meeting strict budgetary, quality and performance requirements, has consistently embraced integrated design-build project delivery.

Departments

Members in the News 

Projects to Watch 

New Members 

1100 H Street, NW, Suite 500 Washington, DC 20005-5476
Phone 202-682-0110 - Toll Free 866-692-0110 - Fax 202-682-5877