BE, see Collaborating for the Built Environment
BE&K Construction Co.: XIII/12/42 (MN), VII/11/14 (MN)
BE&K Government Group, Inc., XIV/9/31 (MN)
BFW Construction Co., Inc.: VII/10/9 (PW); VII/7/7 (PW)
Bailey, Beverly, Stronghold Engineering, Inc., Gossage, Charles, Stronghold Engineering Inc., CS “Combat Recovery” XIV/11/12
Balfour Beatty plc: XV/4/34 (PW), XIV/5/42 (MN)
Balz, David B., Haskell,
with Hartung, Robert J., DBIA, Alternative Delivery Solutions LLC (FS) “Carmen Dragon Elementary School, California’s First Design-Build Public School – A Success Story with Valuable Lessons Learned”, XII/12/22
CS “Design-Build for Renovation/Expansion of School Facilities: A Laboratory Approach” XIV/6/8
Banicki, Robert, Roof Products, Inc., FS “Specifications for Success”, XIV/7-8/15
Bannett, Barry E., R.A., AIA, DBIA, The Bannett Group, FS “Challenges for Bonding and Warranty for a Design-Led Design-Build Firm”, XIII/3/30
Bannett Group, The: XIV/5/43 (MN), XIV/3/48 (MN), XIV/2/32 (MN), XIII/7-8/26 (MN), XIII/6/50 (MN), XIII/3/40 (MN), XIII/1/57 (PW), X/5/10-11 (MP), X/1/15 (PW)
Barclay White Skanska, Inc., see Slattery Skanska, Inc.
Barker, Richard M., Ph.D., and Puckett, Jay A., Ph.D., P.E., Design of Highway Bridges – An LRFD Approach, The, BC XV/3/32
Barno, Douglas S., DSB Marketing Group, N.A., with Scott, Simon J., (FS), "FRP Composites in Sports and Recreation," XI/10/36
Barton Malow Company: XV/5/30 (MN), XV/4/34 (MN), XV/3/30 (MN), XV/1-2/36 (MN), XIV/12/58 (MN), XIV/11/24 (MN), XIV/11/24 (PW), XIV/10/75-77 (MN), XIV/9/31 (MN), XIV/7-8/38-39 (MN), V/8/4 (MN); V/6/7 (MN); IV/6/9, 15; III/6/6 (Project Spotlight), 9
Bassetti Architects: VII/5/14-15 (Project Spotlight)
Batcheler, Bob, Newforma, with Howell, Ian, (FS), "The Purpose-Driven Exchange of Project Information," XII/6/34
Beard, Jeffrey L.: X/10/18-19 (PM), X/9/15 (PM), X/8/15 (PM), X/7/14-15 (PM), X/6/15 (PM), X/4/19 (PM), X/3/19 (PM), X/2/15 (PM), X/1/19 (PM), IX/11/19 (PM), IX/10/19 (PM), IX/9/3 (PM), IX/8/3-4 (PM), IX/6/3 (PM), IX/5/3 (PM); IX/4/3-4 (PM), IX/3/3 (PM), IX/2/3 (PM), IX/1/3 (PM), VIII/12/3 (PM); VIII/11/3; VIII/10/3;VIII/8/2, VIII/4/3, VIII/3/3
ED Report: VIII/2/3; VIII/1/3; VII/12/3-4;VII/9/5; VII/3/4-5; V/10/2, 8; V/8/2; IV/4/2; III/1/2; II5/2
Other — VIII/3/1, 3; VIII/1/11 (bio); VII/11/1, 3
Beard, Michael, Rep., XII/12/50 (leadership award)
Beauchamp, Randy, LEED AP, Chinook Systems Inc., with Lenkewich, Wanda, LEED AP, (FS), "Quality in Commissioning," XII/6/43
Beaufort Engineering Services, Inc. (BES): IX/6/13 (PW), IX/2/12 (MN), VIII/11/11 (MN)
Bebee, Jake, Design + Construction Strategies; Heller, Barbara, FAIA, Design + Construction Strategies, FS “Construction Firms Testing BIM Applications” XIV/5/31
Bechtel Group: V/6/7 (MN)
Beck Group: XIV/10/75 (MN) VII/1/12 (Member Profile)
Beckman Construction: VII/9/8 (PW)
Bell , Christopher K., PMP, Primavera Systems, Inc., with Smither, Lee, MBA, FMI, (FS), “Seven Habits of Highly Effective Projects”, XII/10/8
Belle, Richard A., Editor’s Notes, XI/6/3
“Sustainability is not a Luxury” XI/7-8/5
“Reflections on Security” XI/9/5
“Speed and Flexibility Winning Adherents” XI/10/5
“Insurance and Bonding: More Critical Than You Realize” XI/11/5
“The Process Sector: Speed, Precision, and Quality” XI/12/5
“High-Performance Materials: New Tools for the Next Century” XII/1/5
“Water/Wastewater: What Could be More Fundamental?” XII/2/5
“Power and Communication: Taking Nothing for Granted” XII/3/5
“Transportation Challenges: Quality and Execution” XII/4/5
“Criminal Justice: Complexity and Security Drivers” XII/5/5
“Information Technology and Design-Build” XII/6/5
“Increasing Security Demands in our Troubled World”, XII/9/5
“Does Design-Build Nurture Quality and Innovation?”, XII/10/5
“Design-Build and the Public Sector – Opportunities Abound”, XII/11/5
“Design-Build for Educational Facilities: What Legacy do We Leave the Next Generation?” XII/12/5
“Water/Wastewater: When Does Risk Become Unacceptable?”, XIII/1/5
“Sports and Recreation: How Design-Build is an Excellent Fit”, XIII/2/5
“Finance, Insurance, and Risk: Key Challenges for the Design-Build Community”, XIII/3/5
“Design-Build and the Transportation Sector: Raising the Bar”, XIII/4/5
“Design-Build and the Hospitality Sector: Remarkable Opportunities”, XIII/5/5
“Design-Build and the Public Sector:What Are the Challenges Before Us?” XIII/6/5
“Farewell”, XIII/7-8/5
Other, XI/10/19
Benham Companies LLC: XV/5/30 (MN), XIV/11/24 (MN)
Benton, S. Richard, P.E., FASCE, Centennial Contractors Enterprises, Inc. (FS) “What are the Changing Roles When Going from Design-Bid-Build to Design-Build?” XIII/6/20
Bergman, Gary, RA, AFCEE, with Eliah, Elaine, ECC, and Nixon, Brent, Ph.D., P.E., ECC (CS) “Design-Build Under Fire”, XIII/6/8
Bertuca, Robert M., PMP, M.C. Dean, Inc., FS “Design-Build Approach Delivers Enhanced Security for Atlanta’s Mass Transit System, Decreased for Metropolitan Atlanta Rapid Transit Authority” XIV/9/18
BES Inc.: IX/8/12 (MN)
Best Practices (DATELINE Column)
“Brace Your Business for New IBC Requirements”, XIII/10/89
“Optimizing Electronic Security System Investments”, XIII/11/11
“Copyright Protection of Architectural Works”, XIII/12/14
Best practices, Design-Build and: VII/3/2 (PC)
Best practices course: VII/1/5
Best Practices in Design-Build for the Water and Wastewater Industry : X/2/5 (PF)
Best value procurement: IV/4/6
Bestech Systems Ltd.: V/5/9
Betterment Rule: IV/1/10-11
Bexar ElectricCompany: VIII/8/5 (Project Spotlight)
Bexmar Metropolitan Development Corporation (Bexmar Met): VI/10/13-14 (Project Spotlight)
Bid protest (Black & Veatch): VII/11/11
Big-D Construction: VI/5/13 ( PW, MN); V/10/6 (Member Profile)
Billing rates, A/E/P: V/7/1, 6
Biscotte, Michael N., P.E., Hayes, Seay, Mattern & Mattern, (FS), "Design-Build in the Secure Environment," XI/9/25
Black & Veatch: XIV/10/75 (MN), XIV/9/30-31 (MN), XIV/7-8/39 (MN), XIV/6/40-41 (MN)XIV/5/43 (MN), XIV/3/48 (MN), XIV/2/32 (MN), XIV/1/37 (PW); XIII/12/42 (MN), XIII/6/50 (MN), XIII/5/36 (PW), XI/2/10 (MN), XI/2/11 (PW), X/11/15 (PW), X/7/9 (PS), IX/8/12 (MN), IX/6/12 (MN), IX/4/16 (MN), IX/1/11 (MN), VIII/8/13 (MN); VIII/5/12 (MN); VII/11/11; III/2/10-11 (Member Profile)
Blair, Thomas A., P.E., Hard Hat Services, with Russell, Stuart H., P.E., Hard Hat Services, (FS) “PM 2 – Plan, Manage, and Monitor: Three Steps to Effective Design-Build Project Delivery for the Water/Wastewater Industry”, XIII/1/24
Blake, David A., Esq., Seyfarth Shaw LLP, (LB)
"Significant ADA Developments in 2004," XII/4/37
“Risk Allocation in LEED Certification”, XIII/10/29
Blakeslee Prestress Inc.: X/11/15 (PW), X/1/9 (PS), IX/9/13 (PW), IX/7/13 (PW), IX/5/15 (PW); VIII/9/13 (PW)
Blieszner, Edward J., Esq., Kenogle, Norton, Smith & Blieszner, P.C., “Legislative Spotlight: Colorado Design-Build Legislation” XIV/9/25
Bluebook of Building & Construction : VII/4/15
Blueline Online: VII/3/2
Board of Directors, DBIA: XV/1-2/8, XII/1/8, XI/1/6, X/4/6-9, VIII/2/5; VIII/1/1, 8-11; VII/1/1, 6-8; VI/12/1, 4; VI/10/3 (PC); VI/2/1, 7; V/2/6-7; IV/6/6; II/6/1, 8; I/6/2, 6
BOMI, see Building Owners and Managers Institute
Bonafair, Maggie, and Mueller, Kurt, Skanska USA Building Inc., CS, “Ten Lessons for Design-Build Success: Best Practices from the DBIA Award-Winning Georgia Institute of Technology Campus Recreation Center”, XIII/2/8
Bonding: see Insurance
Boring, Delbert F., P.E., American Iron and Steel Institute, (FS), "High-Performance Steels Provide Weight and Cost Savings for Design-Build Projects," XII/1/20
Bovis Lend Lease: VII/12/10 (PW)
Braun, Dena, Alchemy Models Inc., BP, “A Model Solution: How Physical Models can Enhance your Business”, XIV/2/31
Bread Loaf Construction Co.: XII/1/51 (PW), XII/1/50 (MN), XI/11/38 (MN), XI/10/31 (MN), XI/3/1, IX/4/15 (PW), IX/1/9 (PW), VIII/10/10 (Member Profile); III/1/6 (Project Spotlight)
Brechbill & Helman Construction, XII/12/29 (PW), XII/11/71 (PW)
Bridging, National Summit on (2001): VIII/9/5; VIII/7/1
Briggerman, Steven L., Esq., with Weinbaum, Jamison L., Esq., Seyfarth Shaw LLP (FS) “New Federal Acquisition Regulatin Regarding Defects in the Power of Attorney Accompanying a Bid Bond”, XII/11/29
Brigham Young University : IX/5/17 (MN)
Broaddus, James:
President’s Corner—VII/9/3; VII/8/2; VII/7/3-4; VII/5/2; VII/3/2; VII/2/2; VII/1/2; VI/12/2; VI/11/2; VI/10/3; VI/9/2; VI/8/2; VI/6/2; VI/5/3; VI/4/2; VI/3/2; VI/2/3; VI/1/3; V/12/3
Other—VII/7/2 (CM); VI/3/1, 2; VI/2/4; V/11/1, 2
Brokamp, Bob, DORMA Architectural Hardware, BP “Managing Door Hardware Specifications” XIV/7-8/31
Brunelleschi, Filippo: VI/12/6-7
Brunelleschi Lifetime Achievement Awards 2004: XI/6/9
Brunelleschi Lifetime Achievement Award, 2007: XIV/12/32
BSD Costlink©/CM.A: VI/12/9
Building Construction, Inc. : VIII/10/6 (MN); VIII/4/8 (MN)
Building Owners and Managers Institute (BOMI): X/1/8
Building Security: Handbook for Architectural Planning and Design , by Barbara Nadel, BC, XIV/9/38
Building Systems Design (BSD): VIII/5/5; VI/12/9
Building Technology: Mechanical and Electrical Systems, 2nd Edition , by Benjamin Stein, BC, XIV/12/56
Building Type Basics for Colleges and University Facilities, (PF) XII/12/35
Building Type Basics for Hospitality Facilities , XI/6/13 (PF)
Building Type Basics for Justice Facilities , XII/5/35 (PF)
Building Type Basics for Recreational Facilities , Richard J. Diedrich, BC, XIV/2/30
Burgess, Hill, AIA, LEED AP, Wight & Company
(FS) “Design-Build Methodology Well-Suited to Lead the Green Revolution”, XIII/10/44
FS, “Green Goes Mainstream” XIV/10/20
Burgess, Michael, XII/12/50 (leadership award), XI/5/12 (EF)
Burns, Shawn M.: X/4/10 (EF)
Burns & McDonnell Engineering Co., Inc.: XII/7-8/43, VIII/9/13 (PW); VIII/4/8 (MN), VII/5/11 (PW)
Busam, S. James: I/6/2
Busel, John P., American Composites Manufacturer Association, (EF), "Challenges Faced with Using Innovative High-Performance Materials," XII/1/28
Business Cycles: IX/8/1 (MT)
Business education for A/E/P&E principals: VII/6/2
Business Expansion, Top Ten Cities for: VIII/4/1 (Market Trends)
Business Roundtable (BRT): VII/1/1, 5; VI/12/13 (MN); V/9/1, 11; V/7/7
Business-to-business online exchange: VII/8/10
buzzsaw.com: VII/4/15