Eagle Point: VII/12/14
Earl Construction Company (also see Sundt Construction Inc./Northern California): VIII/1/14 (MN—changed name to Sundt Construction Inc./Northern California); VII/11/13 (MN); VII/6/11 (MN)
Earth Tech: XIV/10/77 (PW), XIV/9/10 (PW), XIV/9/30-31 (MN), XIV/7-8/39 (PW), XIV/5/43 (PW), XIII/9/21 (PW), XIII/7-8/26 (MN), XII/12/29 (PW), XII/11/70 (MN), XII/10/57 (PW), XII/9/58 (PW), XII/6/66 (MN), XII/2/42 (MN), XII/1/51 (PW), XI/12/56 (MN), XI/10/31 (MN), XI/4/10 (MN), XI/4/11 (PW), XI/3/11 (PW), X/6/11 (PW), X/5/13 (PW), X/4/15 (PW), X/3/15 (PW), X/3/16-17 (MP), X/1/4 (MN), IX/10/15 (PW), IX/8/13 (PW), IX/7/13 (PW)
Earth Tech Engineering Ltd: XIII/6/51 (PW)
EBCO Construction Group: IX/8/14-15 (MP)
eBricks.com: VII/3/2
Eby Companies: IX/8/14-15 (MP)
Economic forecast, X/3/3,8 (MT), IX/10/3 (MT), IX/6/1 (MT), IX/1/1-7 (MT), 1998: V/5/1, 13
Economic Policy Classification Committee (ECPC): see Standard Industrial Code
Education – New Students, New Technologies, XIII/7-8
Education, Design-Build: XII/1/53
Education Facilities, XII/12
Educational Facilities, Design-Build for, XIV/6
Education and Research Committee, DBIA: V/3/5; III/4/4
Education and Research Foundation, DBIA: VIII/9/8; VII/12/1-2; VII/9/1, 3; VII/5/1, 5; VI/11/3
Education Committee, DBIA: VI/11/3
Educational courses/programs, DBIA: VIII/10/15; VII/5/3; VII/1/3; VI/11/3; VI/9/1, 3; VI/7/1, 2, 9; VI/6/1, 6; VI/3/9; VI/2/6; V/4/3; V/3/1, 3,10; V/2/10; IV/6/4 (CM); III/5/1, 3 (CM); III/1/1, 5
Education Tour, 2006, XIII/1/31
Education Tour 2007, XIV/1/38
EFFORT, see Equal Footing For Owners’ Round Table
Eichfeld, Diana, XL Insurance, FS, “Mainstreaming Environmental and Professional Liability in Design-Build Risk Management”, XIII/3/18
Eickmann, Lt. General Kenneth E.: V/11/5; V/7/7
Eiffel, Gustave: VII/12/8-9
Election results: IX/11/3 (MT)
Electric industry: V/8/1, 4
Electronic (e) commerce: IX/2/1, 7(MT)
Elford, Inc.: VIII/4/8 (MN), VI/11/13 (MN)
El-Hage, Maroun, P.E., Jacobs, with Klepac, John E., P.E., and Fredrickson, Ken, P.E., CCM, DBIA, (FS), "Site Development and Remediation: Working under Severe Time Constraints," XI/10/14
Eliah, Elaine, ECC, with Nixon, Brent, Ph.D., P.E., ECC, and Bergman, Gary, RA, AFCEE (CS) “Design-Build Under Fire”, XIII/6/8
Elvin, George: VII/6/11 (MN)
El Wardani, Marwa A., Pennsylvania State University, with Horman, Michael J., Ph.D., Messner, John I., Ph.D., (FIS), "Comparing Design-Build Procurement Methods," XII/4/42
EMCOR Group, Inc.: XIV/7-8/38 (MN), XII/9/56 (MN), XII/4/45 (MN), XII/1/50 (MN), X/11/14 (MN), X/2/10 (MN), IX/9/9 (PS)
EMCOR Services, XIV/4/45 (MN)
EMCOR Services Fluidics, XIV/5/43 (MN)
Energy issues: IX/5/1,7 (MT)
Energy Efficiency Buildings Act: VII/10/8
Enforcing subcontract language: VIII/12/11
Engdahl, David, AIA, DBIA, The Haskell Company, with Simons, Lance G., Speaking of Safety
“Elements of a Safety Program” XI/10/8
“Implementing a Superior Safety Program” XI/11/18
“Code of Safety Practices” XI/12/55
“Working with OSHA” XII/1/13
“Designing for Safety – We’re All Responsible” XII/2/20
“Anticipating the Worst” XII/3/51
Engdahl, David, XII/12/52 (press award)
Engineered Quality in Construction Partnering & TQM : I/4/5
Engineering community, DBIA working with: IV/5/2 (CM)
Engineering News-Record (ENR): VI/12/3; V/7/1, 2; IV/2/11: III/2/3; II/3/3; III/4/3
Environmental Protection Agency (EPA): V/4/1, 7
Environmental remediation projects: IV/5/8-9
Eppstein-Uhen Architects, Inc.: VII/1/10 (PW)
Equal Footing For Owners’ Round Table (EFFORT): X/1/18, IX/10/5, IX/9/8, VIII/11/3 (PM)
Ericksen, Jason, Steel Solutions Center, American Institute of Steel Construction, “Resources: Steel Solutions Center” XIV/4/41
Erie water treatment facility: IX/10/1, 4
Ernst, Steven L., P.E., Office of Bridge Technology, Federal Highway Administration, U.S. Department of Transportation, (FS) “Highway Transportation Security for the Design-Build Community”, XII/9/43
Essex Construction: V/11/15
Estimating: II/3/5
European Construction Institute (ECI): VII/12/10
Evans, Don S., CH2M Hill, Board Reflections,
“ Las Vegas – Worth the Time and Money!” XII/7-8/7
Other: XII/1/8, IX/10/12 (EF)
“Design-Build Reflections in the Transportation Market”, XIV/3/9
Evans, Don S., Operational Management, Inc., Board Reflections, “Dedicated to Your Success”, XIII/2/6
Everett Special Events Center : X/10/1, 4-5
Evey, Walker Lee
President’s Message, XI/6/19
“Some Preliminary Observations” XI/7-8/6
“Moving Forward” XI/9/6
“New Opportunities, New Services” XI/10/6
“A Plentiful Table” XI/11/6
“Exceeding Expectations” XI/12/6
“On Becoming More Effective Design-Builders” XII/1/6
“Limitations” XII/2/6
“Design-Build, Quality, and Outsourcing” XII/3/6
“Deeper Penetration of the Marketplace” XII/4/6
Other – XII/1/12, XI/5/3
“What Once was Old has Become New Again”, XIII/9/5 (PN)
“Board Reflections”, XIII/12/9
“Board Reflections”, XIV/1/9
“Board Reflections: A Great Loss to our Industry & Membership” XIV/5/9
BR “A Design-Build Final Exam; The Pentagon Phoenix Project: 11 September 2001 to 11 September 2002” XIV/9/7
BR “You are Power” XIV/12/10
BR “The Perfect Storm”, XV/4/4
Excel Company: see GSC Design-Build, LLC (MN)
Exeter Development/Phoenix Construction: XI/1/15 (PW)
EXXCEL Contract Management, Inc.: VIII/7/10 (MN); VI/9/15 (PW)
EXXCEL Project Management, Inc.: VIII/12/9 (MN)