Welcome, you are not logged in.
Login | Register
Design-Build DATELINE
The Journal of the Design-Build Institute of America

Design-Build DATELINE

DATELINE Index - G


GSC Design-Build, LLC: VII/5/10; V/6/7

Gannett Fleming: XIV/10/75 (MN), XIV/4/44 (MN), XIV/1/37 (MN), XIII/5/35 (MN), X/9/11 (MN), VIII/8/13 (MN)

Garmong Design/Build Construction: VIII/8/12 (Member Profile)

Garrett, Steve, HSMM, Inc., with Lemonds, Don, HOK, Inc., and Rivenbark, Scott, Skanska USA Building, Inc., (CS), “Anatomy of a Healthcare Design-Build Project: How a Regional Medical Center Expands in Place Without Dropping a Suture”, XIII/9/8

Garrison, Ted, Garrison Associates (EF) “Why the Best Value Approach and Hospitality Industry Are a Perfect Match for the Design-Build Contractor”, XIII/5/44

Gates, Steve, P.E., DEE, R.W. Beck, Inc., with Tangora, Pat, P.E., R.W. Beck, Inc., (EF) “Efforts to Streamline D-B Procurement Must Take Owner’s Concerns into Account”, XIII/1/58

Gaylor, John C., Gaylor Group, Inc., with Longfellow, Randall L., (FS), "Electrical Contractor Engineering Design Services and Construction Processes Integration," XII/3/13

GE Johnson Construction Company: XIV/4/44-45 (MN), XIII/5/36 (PW), XIII/4/51 (MN), XIII/2/15 (MN), XIII/2/21 (PW), XIII/1/57 (PW), XII/11/71 (MN), XII/7-8/43, XII/6/67 (PW), XII/5/38 (PW), XII/3/44 (PW), XII/1/50 (MN), XI/12/57 (PW), XI/10/31 (MN), XI/4/11 (PW), IX/8/12 (MN)

General Services Administration (GSA): V/7/6; V/5/1, 3; IV/2/5, 16; III/1/3; II/6/3; II/2/3,5; I/2/2, 3

Genetti, Maj. Gen. Albert J.: IV/2/1

Geographic expansion of DBIA: VII/3/3 (CM)

George Butler Associates: XV/4/34 (MN), XI/4/10 (MN), VIII/1/11 (PW)

Georgia Institute of Technology: IX/12/1,4-6

Giachino, John (EF) “Current Construction Market Conditions Present Price Challenges to Owners and Design-Builders”, XIII/6/41

Giacoletto, Paul, Clayco, FS, “Restoring the Ely Walker Building to its Original Grandeur”, XIV/2/16

Gibbs & Register, XIII/7-8/26 (MN)

Gidez, Greg, AIA, Fentress Bradburn Architects

(CS), "Design-Build Meets Design for Excellence," XII/5/8

(MR) “Lean Meets Green: Design-Build Project Delivery Integrates Sustainability in High-Performance Buildings”, XIII/10/11

“Board Reflections” XIV/4/7

BR “Design-Build, Sustainability, and Longevity: The Right Fit” XIV/10/12

Gilbane Building Company: IX/3/12 (MN), VIII/7/4 (Member Profile)

gkkworks, XIV/6/41 (MN)

Gladson, Rebekah G., AIA, AUA, University of California, Irvine

Board Reflections, "Fundamental Change is Not Easy," XII/6/7

Perspectives, XIII/12/44

Glen Construction Company: V/5/8 (MN); V/2/11 (PW)

Global building/construction study: VII/10/8

Global Construction Summit 2004 ( Beijing), XI/3/3

Global market outlook: VIII/2/1, 2

Globalization: : IX/3/1,7 (MT ), VIII/3/1, 5; VI/8/3 (CM); IV/6/3, 4

Glynn, Sean, Skanska USA Civil, Diemer, Karen, Skanska USA Civil, CS “Construction of Dey Street Concourse Structural Box Presents Many Unique Challenges” XIV/9/12

Goddard, Madeline F., P.E., Planning Research and Program Management Division, City of Phoenix, Hayes, Troy, P.E., Treatment Plant Engineering Division, City of Phoenix, Quarendon, John R., American Water Services Company, “Phoenix Water Rising from the Desert With a Successful Alternative Project Delivery”, XIV/1/21 (FS)

Goldberg, H. Edward, AIA, NCARB “Entering the Virtual Realm of the BIM”, XIII/12/12 (EF)

Goodkind & O’Dea: VIII/5/12 (MN); VIII/4/8 (PW), VIII/3/13 (MN); VIII/1/13 (MN); VII/12/13 (MN); VII/10/10 (MN); VII/5/9 (MN); VII/4/7 (MN); VII/1/11 (PW), 14 (MN)

Goodman Associates: VII/7/6-7 (Project Spotlight), 10 (PW); VII/6/7 (PW), 12 (MN); VII/5/10 (MN); VII/4/11 (PW)

Gorden, Stephen: VII/1/15

Gossage, Charles, Stronghold Engineering Inc., Bailey, Beverly, Stronghold Engineering, Inc., CS “Combat Recovery” XIV/11/12

Gottlieb Skanska, Inc., XI/6/14 (MN)

Gowan, Inc., XII/9/56 (MN)

Granite Construction Company: VI/8/9 (Member Profile); VI/7/5 (PW)

Gransberg, Douglas D., Ph.D., P.E., DBIA, University of Oklahoma

with Molenaar, Keith R., Ph.D., DBIA, (FIS), "Life Cycle Evaluation Criteria for Design-Build Transportation Projects," XII/3/42

with James E. Koch, Ph.D., P.E., Keith R. Molenaar, Ph.D., Preparing for Design-Build Projects: A Primer for Ownwers, Engineers, & Contractors, BC, XIV/4/37

BC, XIV/11/28

Other: XII/7-8/43

Graphisoft: VIII/4/2

Grauer, Steve, Hensel Phelps Construction Company, with Jim Mueller, (FS), "The Unfinished Revolution," XII/5/12

Graves , Michael: II/5/1,8

Gray, C.C. Howard: VIII/1/10 (bio)

Gray Construction, XIV/2/32 (MN)

Gray, Inc. : VIII/5/13 (MN)

Graycor Inc.: VIII/1/7 (PW), 12-13 (Member Profile); VII/9/10 (MN); VII/3/7 (MN); VII/2/8 (MN), 12 (PW)

Great Lakes Chapter (prior to actual formation, variously designated the Chicago or Midwest chapter): VIII/10/7; VIII/9/15; VIII/2/10; VI/8/1, 4; VI/7/2; VI/4/3

Green Building : VII/9/1, 4

Green, William O., P.E., DBIA, LEED AP, The RMH Group, Inc.

XII/1/12

(BR) “Design-Build Design Competitions”, XIII/9/7

BR “Chellenges in CM-at-Risk Contracts” XIV/7-8/9

Greenberg, Bennett D., Esq., DBIA, Seyfarth Shaw LLP

Board Reflections, “Design-Build and the Federal Government – Taking the Next Step”, XII/11/7

“Board Reflections”, XIII/11/9

Other, XII/1/11

Greenhorne & O’Mara: XIV/9/31 (MN)

Griffis, Lawrence G., XI/1/14 (MN)

Groene Hart Tunnel: X/1/1,4-6

Groff, David C., Esq., Groff Murphy Trachtenberg & Everard PLLC, with Parkinson, Robynn Thaxton, Esq., DBIA, (LB), "There is No 'I' in Team, but There is a 'U' in Lawsuit: Enforceability Issues in Teaming Agreements," XII/6/60

Group Mackenzie: VIII/10/12 (Project Spotlight)

G.R. Sponaugle & Sons, Inc.: IX/11/14 (MN)

Grunley Construction: XV/3/30 (PW), XIV/6/40 (MN), XIV/2/33 (PW ), XII/11/70 (MN), XI/12/57 (PW), XI/12/56 (MN)

GRW, Inc.: .XIII/12/42 (MN), X/4/15 (MN), IX/9/12 (MN)

Gransberg, Doug: IX/11/12 (EF)

Grunley Construction: XIV/10/75 (MN), XIII/4/51 (MN), XII/12/15 (MN)

Guarantee Electrical Company: X/2/11 (PW)

Guenther, Robin, and Vittori, Gail, Sustainable Healthcare Architecture, BC, XIV/12/54

Guide to Federal Design-Build Marketplace : VII/4/13

Guidelines for Constructing Buildings of Higher Learning , XIII/7-8/41 (PF)

Gunderson, Nancy, Office of the Undersecretary of Defense for Acquisition, Technology and Logistics, with Hoag, Diana, CPCM, (FS), "Contract Incentives and Design-Build: Rethinking Acquisition Strategies," XII/2/35

Gunkel, Thomas: XII/1/9, VIII/1/10 (bio)

Gunkel, Thomas F., M. A. Mortenson Company, Board Reflections, “The Hospitality Sector Welcomes Design-Build”, XIII/5/7

Gus F. Atkinson Construction, XII/9/58 (PW)

G
 
1100 H Street, NW, Suite 500 Washington, DC 20005-5476
Phone 202-682-0110 - Toll Free 866-692-0110 - Fax 202-682-5877