H.B. Zachry Company: VIII/6/4 (Member Profile)
HBG Constructors, Inc.: XI/5/14 (MN)
HBG Flatiron, Inc.: XI/2/1
HDR, XIV/1/37 (MN)
HDR Architecture, Inc., XIV/6/40 (MN)
HDR Construction Company: XIII/3/41 (MN), XII/11/70 (MN), XII/3/43 (MN), XII/2/43 (PW)
HDR Design-Build, Inc.: XIV/5/43 (PW)
HDR Engineering, Inc.: XIII/10/95 (MN), XIII/7-8/27 (PW), XII/10/56 (MN), XII/7-8/43, XI/3/10 (MN), X/10/16-17 (MP), X/9/11 (MN), X/6/10 (MN), X/6/11 (PW), X/5/13 (PW), X/2/11 (PW), IX/11/15 (PW), IX/10/14 (MN), IX/7/13 (PW), VIII/11/11 (MN); VIII/3/14 (MN)
HEA Group: III/4/10 (Member Profile)
HIIT Contracting: V/8/5 (MN); V/7/3 (PW)
H&H Systems and Design, Inc.: IX/11/14 (MN)
H & M Construction Co.: II/6/7 (Member Profile); I/2/7
HNTB Architects: VIII/3/14 (MN); VII/6/10 (PW); VII/5/10 (PW); VII/1/9 (Project Spotlight); VI/10/12 (MN), 15 (PW); V/8/5 (MN); V/3/7 (PW); IV/6/8, 15; IV/4/11-12 (Project Spotlight)
HOWA Construction, Inc.: VI/9/10 (MN)
Hagan, Dave, J.R. Abbott Construction, (FS), “Healthcare Facilities: Some Lessons Learned,” XII/7-8/20
Haig, Barbara, Barbara Haig Communications LLC, with Reinders, Gerrit, Johnson Controls Inc., (FS) “Green and Growing: Design-Build Advances in Sustainability Realm”, XIII/10/65
Haley & Aldrich: XI/7-8,34 (MN), X/8/10 (MN), X/4/15 (MN), IX/5/18-19 (MP)
Halkias, George, Astorino, (EF), "Design-Build and Sustainability," XI/7-8/32
Halliday, John S., St. Paul Travelers Bond, (CS), "Managing Contractual Risk," XI/11/8
Hallman, Jack, General Motors Corporation, with Ivanikiw, Alex, AIA, Barton Malow, and Mauck, Robert J., AIA, P.E., GHAFARI (FS) “3D Enabled Lean, Collaborative Design-Build Delivery General Motors Flint V6 Engine Assembly Plant”, XIII/12/17
Hallstrom, Robert M., AIA, DBIA, KTH Architets, Inc.,“Moving in the Right Direction” XIII/7-8/43 (EF)
Haltner HAI: XII/7-8/51
Halverson, Steven:
CM: VIII/12/2 (CM); VIII/11/2 (CM); VIII/10/2 (CM); VIII/9/2 (CM); VIII/5/2; VIII/3/2; VIII/2/2; VIII/1/1, 2
Other: VIII/8/6; VIII/1/8 (bio); VII/11/1, 2; VII/1/6; V/2/6
Handbook on Project Delivery : X/12/9 (PF)
Hankins and Anderson, Inc.: XIV/2/33 (PW), VI/12/10 (PW)
Hanscomb, Inc.: VI/5/13 (MN); VI/4/14 (MN)
Hanson, Mark, Ph.D., LEED AP, Turner, Stephen, P.E., CTG Energetics, Inc., FS “Design-Build Firm Delivers New High School with LEED® Gold Certification” XIV/6/22
Harboe, T. Gunny: VII/5/8 (MN)
Hard Hat Services, Inc.: XIII/2/15 (MN), XIII/1/53 (MN)
Harkins Builders: XIII/6/50 (MN), XII/2/42 (MN), XI/6/14 (MN), XI/3/11 (PW), X/3/14 (MN), X/2/11 (PW), IX/10/15 (PW), IX/5/17 (MN); IX/2/12 (MN), IX/2/13 (PW), VIII/11/9 (PW); VIII/2/14 (MN); VII/11/7, 11 (PW), 13 (MN); VII/9/8 (PW); VII/6/11 (MN); VII/4/10-11 (Project Spotlight), 12 (PW); VII/3/10 (MN); VII/2/12 (PW); VII/1/13 (MN); VI/12/13 (MN); VI/10/14 PW); VI/8/11 (MN); V/8/7 (PW); V/4/3 (MN)
Harold O’Shea Builders: XIV/9/30 (MN), XIV/2/33 (PW), XIV/1/37 (MN), XIII/6/51 (PW), XII/12/15 (MN), XII/11/70 (MN), XII/10/57 (PW), XII/9/58 (PW), XII/6/67 (PW), XI/12/57 (PW), XI/12/56 (MN), XI/9/43 (PW), XI/7-8/35 (PW), XI/5/15 (PW), XI/2/11 (PW), XI/1/15 (PW), X/10/15 (PW), X/8/11 (PW), X/7/12-13 (MP), X/6/11 (PW), X/5/13 (PW). X/2/10 (MN), IX/12/15 (PW), IX/11/14 (MN), IX/11/15 (PW), IX/7/12 (MN), IX/5/15 (PW); VIII/12/10 (PW); VIII/11/9 (PW), VIII/11/11 (MN); VIII/10/13 (PW)
Harper Limbach LLC, XIII/12/42 (MN)
Harper Mechanical: XI/6/14 (MN)
Harris Construction Company: XII/10/56 (MN), XII/5/36 (MN), XII/3/43 (MN), XI/10/32 (PW), XI/7-8,34 (MN), XI/2/11 (PW)X/2/10 (MN), X/1/14 (MN)
Harter, Tom, DBIA, Kiewit Corporation, with Tardy, Randy, P.E., (FS), "Electronic Document Management Systems (DCMS): The Hub of Design-Build Practice," XII/6/14
Hartung, Robert J., DBIA, Alternative Delivery Solutions LLC
with Balz, David B., Haskell (FS) “Carmen Dragon Elementary School, California’s First Design-Build Public School – A Success Story with Valuable Lessons Learned”, XII/12/22
FS “Model Methods” XIV/12/18
Haselden Construction, Inc.: IX/5/16 (MN); IX/2/13 (PW), VIII/8/15 (PW)
Haskell (formerly The Haskell Company), XIII/10/95 (MN), XII/12/15 (MN), XII/11/70,71 (MN), XII/10/56 (MN), XII/10/57 (PW), XII/7-8/51, XII/7-8/43, XII/6/67 (PW), XII/5/38 (PW), XII/4/45 (MN), XII/3/44 (PW), XII/2/43 (PW), XII/2/42 (MN), XI/12/56 (MN), XI/11/39 (PW), XI/10/32 (PW), XI/9/42 (MN), XI/6/15 (PW), XI/5/14 (MN), XI/4/10 (MN), XI/3/10 (MN), XI/2/10 (MN), XI/1/14 (MN), X/12/10 (MN), X/10/14 (MN), X/10/15 (PW), X/9/11 (PW), X/8/11 (PW), X/7/11 (PW), X/5/13 (PW), X/4/15 (PW), X/3/14 (MN), X/3/15 (PW), X/2/10 (MN), X/2/11 (PW), X/1/14 (MN), IX/12/14 (MN), IX/12/15 (PW), IX/11/14 (MN), IX/11/15 (PW), IX/10/15 (PW), IX/9/12 (MN), IX/9/13 (PW), IX/7/12 (MN), IX/7/14-15 (MP), IX/6/12 (MN), IX/6/13 (PW), IX/5/15 (PW); IX/5/16 (MN); IX/4/15 (PW), IX/4/16, 18 (MN), IX/3/12 (MN), IX/3/13 (PW), IX/2/12 (MN), IX/1/9 (PW), IX/1/10 (MN), VIII/12/9 (MN); VIII/11/9 (PW); VIII/10/6 (MN); VIII/9/9 (MN); VIII/8/14 (MN), VIII/8/15 (PW); VIII/7/10 (MN); VIII/7/11 (PW); VIII/5/12, 13 (MN); VIII/5/14 (PW); VIII/4/8, 10 (MN), VIII/4/9 (PW), VIII/3/7 (PW), 13-14 (MN); VIII/2/13 (MN); VIII/1/13 (MN); VII/12/13 (MN), 14 (MN); VII/11/10, 11 (PW), 13 (MN); VII/8/10, 12 (MN); VII/7/12 (MN); VII/6/10 (PW); VII/5/9 (MN), 10 (PW); VII/4/11 (PW); VII/3/12 (PW);VII/2/8 (MN); VII/1/10 (PW), 13 (MN); VI/12/10 (PW); VI/12/13 (MN); VI/11/13 (MN); VI/10/11 (MN); VI/9/10 (MN); VI/9/5, 15 (PW); VI/8/5 (PW), 10 (MN); VI/7/12 (MN), 13 (MN); VI/6/6 (PW), 7 (MN); VI/5/12 (PW); VI/1/8 (PW); V/12/9 (PW); V/11/4 (MN); V/9/4 (MN, PW); V/8/4 (MN), V/5/7 (PW); IV/6/8-9; I/2/7
Haskell, Preston, P.E., DBIA:
CM: I/5/2; I/4/2; I/3/2; I/2/2, 8
(FS), "Construction Industry Productivity: Its History and Future Direction," XII/6/51
Other: IX/9/6, VII/12/1-1; V/3/4; V/2/6; IV/1/4; I/6/6
“Pacesetter: Preston Haskell Gathered Design-Build Proponents 15 Years Ago, and DBIA was Born” XV/5/34
Haskins, Scott, Utility Systems Management, Seattle Public Utilities, “Utilizing Design-Build in Seattle: Q&A with Scott Haskins”, XIV/1/11
Hassett, Dan, VIRTEXCO Corporation, FS “Sustainability and Security” XIV/9/27
Haws & Tingle General Contractors, Inc.: X/11/15 (PW), IX/1/10 (MN), VIII/12/9 (MN), VIII/12/10 (PW); VI/6/7 MN); VI/2/6
Hayes, Seay, Mattern & Mattern, Inc.: XIV/10/75 (MN), XIV/9/31 (MN), XIV/2/32 (MN), XIII/7-8/26 (MN)XIII/6/50 (MN), XII/11/71 (MN), XII/10/56 (MN), XII/7-8/51, XI/10/31 (MN), XI/3/10 (MN), X/12/10 (MN), X/1/16-17 (MP), IX/10/15 (PW), VIII/5/14 (PW)
HSMM Buildings: XIII/4/51 (MN)
Hayes, Troy, P.E., Treatment Plant Engineering Division, City of Phoenix, Goddard, Madeline F., P.E., Planning Research and Program Management Division, City of Phoenix, Quarendon, John R., American Water Services Company, “Phoenix Water Rising from the Desert With a Successful Alternative Project Delivery”, XIV/1/21 (FS)
Hays, Ken, Masonry Arts, Inc., (CS), "Protection at Any Price? A Discussion About Blast Resistant Windows," XI/9/8
Hays, R. Terry, CVS, Value Management Strategies, Inc., (FS), "Value Engineering on Transportation Projects," XII/4/27
Health and Human Services (HHS) Design-Build Conditions: IX/2/7
Health Care, Combat Recovery: San Diego’s New Casualty Care Center, XIV/11
Healthcare and Design-Build: A Dynamic Relationship, XII/7-8
Healthcare Conference, 2007, XIV/9/32
Healthcare Design , by Sara O. Marberry (Editor), BC, XIV/12/54
Healy, Kerry, Lt. Gov., XII/12/50 (leadership award)
Hedlund, Eric H., Sundt Construction, with Ferreira, Prisila, Flynn, Bill, Teller, Stefanie B., Willcox, Kent, (FS), "Fast-Growing Arizona City Finds Design-Build a Perfect Solution for its Public Safety Complex," XII/5/26
Heery International: XIII/7-8/26 (MN), XIII/5/35 (MN), XIII/4/51 (MN), XI/9/42 (MN), IX/5/16 (MN); IX/4/16 (MN), I/6/5 (Project Spotlight)
Heitmann & Associates, Inc.: XIII/4/51 (MN), XII/12/15 (MN), XII/6/66 (MN)
Heller, Barbara Golter, FAIA, Design + Construction Strategies
(FS) “Integrated Processes in Building Construction: A Leadership Opportunity for the Federal Sector”, XIII/6/14
with Bebee, Jake, Design + Construction Strategies, FS “Construction Firms Testing BIM Applications” XIV/5/31
Hendrich, Jeffrey, P.E., DEE, RLS, MWH Americas, with Schrank, Andrew, P.E., Earth Tech Inc., Krause, Terry, P.E., DEE, Earth Tech Inc., Nardi, Vincenzo, ABB, and Mansour, Emad, CCM, PMP, EPE, MWH Americas, (CS), “Design-Build in Egypt – An International Perspective”, XIII/1/8
Henk, Gregory G.: IX/2/11 (EF)
Henry, Bradford, P.E., URS
with Tardy, Randy, P.E., Bentley Systems Inc., (FS) “3D Design Makes Sense on Design-Build Projects”, XIII/4/18
FS “Design-Build Innovation Shaves Two Years Off Completion of $232 Million Minnesota Highway Project” XIV/5/24
Hensel Phelps Construction Co.: XV/4/34 (PW), XIV/7-8/39 (PW), XIV/3/49 (PW), XIV/2/32 (MN), XIII/9/13 (MN), XIII/5/36 (PW), XIII/2/21 (PW), XIII/1/57 (PW), XII/3/44 (PW), XI/4/10 (MN), X/12/11 (PW), X/5/13 (PW), X/1/15 (PW), IX/8/13 (PW), IX/2/12 (MN), IX/1/9 (PW), VIII/11/9 (PW); VIII/10/14; VIII/9/13 (PW); VIII/8/15 (PW); VIII/7/11 (PW); VIII/5/14, 15 (PW); VIII/2/7 (PW); VII/11/7, 11 (PW); VII/4/11 (PW); VII/3/12 (PW); VII/1/13 (MN); VI/9/5, 15 (PW); VI/8/11 (MN); VI/2/4; IV/2/6-7 (Member Profile)
Herbst, Douglas, CH2M Hill, with Mackenzie, David, Alternative Resources, Inc., (FS) “To Pursue or Not to Pursue: Risk Allocation Imbalance Thwarts Competition and Lessens Value to Owners”, XIII1/60
Hernandez, David J., with Sweeden, Dick, and Kromis, Daniel, DBIA, all with Healthcare Solutions Group, Inc. (FS), “Relationship Building: The Key to Success in Healthcare”, XIII/9/38
H & H Systems and Design: VIII/3/10 (PW), 13 (MN); VII/10/9 (PW)
HHS, see Health and Human Services
High-Performance Construction Materials – What are the Opportunities for Design-Builders? XII/1
High speed rail projects: IV/4/12-13
High Tec HVAC: XIII/3/41 (PW)
Highway, Aviation, Inland Waterway & Harbor Maintenance Trust Funds: III/3/3
Highway/bridge projects: VI/12/11; VI/11/9; VI/10/6; VI/3/8; VI/1/1, 7; V/12/8; IV/3/5
Highway Design Claims: VIII/4/4
Highway funding: XII/7-8/48, VII/7/1,5; V/6/11
Highway projects, study, XII/7-8/40
Hindley, G. Stephen, AIA, ALSC Architects, FS, “Gonzaga University Scores Big by Using Design-Build for McCarthey Athletic Center”, XIII/2/22
Hinsley, Bill, XIII/10/98 (Perspectives)
Hiring market, Design-build professionals: VIII/5/1-2; II/5/5
HNTB Corporation: X/5/9 (MN)
Hoag, Diana, CPCM, Xcelsi Group LLC, with Gunderson, Nancy, (FS), "Contract Incentives and Design-Build: Rethinking Acquisition Strategies," XII/2/35
Hoffman Construction Company: VIII/10/12 (Project Spotlight)
Hoffman, Paul: VIII/1/10 (bio)
HOK Design+Build: IX/4/16 (MN)
HOK Sport: XIV/10/75 (MN), XIII/7-8/27 (PW)
Homeland security:IX/7/1,6 (MT)
Honeywell/Gamewell-FCI: XV/4/34 (MN)
Honeywell Power Products: XV/5/30 (MN)
Hopper, Leonard J., FASLA, New York City Housing Authority Landscape Architecture Division, and Droge, Martha J., LEED AP, Ayers/Saint/Bross
(CS) “Site Security Design: Marrying Good Form with Function”, XII/9/8
(FS), “Out of Site, Not Out of Mind: Site and Off-Site Considerations for Security Design”, XIII/11/12
Horman, Michael J., Pennsylvania State University
with Riley, David R., (FS), "Design-Build as a Key Enabler of Sustainable Construction and LEEDr Projects," XI/7-8/36
with El Wardani, Marwa A., and Messner, John I., Ph.D., (FIS), "Comparing Design-Build Procurement Methods," XII/4/42
Hospitality, Retail, and Office Buildings, XIV/7-8
Howard Shockey & Sons, Inc.: VI/11/11 (PW)
Howell, Ian, Newforma, with Batcheler, Bob, (FS), "The Purpose-Driven Exchange of Project Information," XII/6/34
Hubbard, Gunnar, with Pulaski, Michael H., Ph.D., Fore Solutions, (FS) “Leveraging Sustainable Construction Knowledge on Design-Build Projects”, XIII/10/75
Huffman, Rex D., DBIA, Gibbs & Register, Inc.: XII/3/41, VII/1/1, 4, 8
Board Reflections, “Transportation Design-Build – The Past Decade”, XIII/4/7
Human capital: VII/10/1,3 (Market Trends)
Hunt Midwest Enterprises: VII/11/10 (PW)
Huntsinger, Thomas: VIII/11/11 (MN)